Pengaruh Penjadwalan Dan Fasilitas Pemuatan Terhadap Waktu Tunggu Kapal Pada Transshipment Muara Berau Di PT Indo Tambangraya Megah

Siti Annisafa Oceania, Wenny Ananda Larasti, Melia Handayani

Abstract


THE EFFECT OF SCHEDULING AND LOADING FACILITIES ON SHIP WAITING TIME ON MUARA BERAU TRANSSHIPMENT AT PT INDO TAMBANGRAYA MEGAH

This study aims to analyze the influence of Vessel Scheduling and Loading Facilities on Vessel Waiting Time in the transshipment operations of PT Indo Tambangraya Megah Tbk at Muara Berau. The main operational issue identified is the high incidence of waiting cargo and waiting loading facilities, which prevents vessels from being served immediately upon arrival. This condition leads to increased waiting time and demurrage charges. The study employs a quantitative survey approach using primary and secondary data, and shipment documentation from January to March 2025. Data analysis was conducted through classical assumption tests and multiple linear regression to assess both simultaneous and partial effects of the independent variables. The findings indicate that Vessel Scheduling and Loading Facilities jointly have a significant influence on Vessel Waiting Time. However, partially, only the Loading Facilities variable shows a significant effect, whereas Scheduling does not significantly reduce waiting time. These results reflect real operational conditions where well-prepared schedules cannot be fully realized due to equipment downtime and limitations in loading capacity. The coefficient of determination, 60.3%, demonstrates that most variations in vessel waiting time are explained by the two variables. Overall, the study concludes that improving the readiness and capacity of loading facilities is the most dominant factor in reducing vessel waiting time in transshipment operations at Muara Berau.


Keywords


Scheduling; Loading Facilities; Vessel Waiting Time; Transshipment.

References


Banna, H. A., & Indri, Z. (2023). Potensi Ekonomi Bahari Indonesia. Jebesh: Journal Of Economics Business Ethic And Science Histories, 1(2), 9-14.

Heizer, J., & Render, B. (2016). Operations Management (12th Ed.). Pearson.

Indartini, Mintarti, & Mutmainah. (2024). Analisis Data Kuantitatif. Universitas Merdeka Madiun.

Jacobs, F. R., & Chase, R. B. (2015). Operations And Supply Chain Management (14th Ed.). Mcgraw-Hill Education.

Kuehne+Nagel International Ag. (2025). Seaexplorer Schedule Reliability Report: Global On-Time Performance And Arrival Delay Data, January 2025. Kuehne+Nagel International Ag.

Kowalski, J., & Wiśniewski, P. (2016). Mass Cargo Handling In The Port Of Szczecin. Scientific Journals Of The Maritime University Of Szczecin, 47(119), 90-98. Kuehne+Nagel International Ag. (2025). Seaexplorer Schedule Reliability Report: Global On-Time Performance And Arrival Delay Data, January 2025. Kuehne+Nagel International Ag.

Langgeng, H. B. S., Nuha, H., & Murnawan, H. (2022). Analisis Sistem Antrean Pelayanan Bongkar Muat Kapal Tongkang Batu Bara Pada Mother Vessel Untuk Meminimalisir Waktu Bongkar Muat Pada Pt. Handil Bhakti Persada. Jurnal Teknik Industri, 12(2), 133-143.

Manik, W. (2023). Analisis Faktor Penyebab Demurrage Terhadap Kelancaran Pemuatan Batu Bara Pada Proses Transshipment Di Pt. Jaya Pandu Transindo Sejati Dan Maritim (Doctoral Dissertation, Politeknik Pelayaran Sumatera Barat).

Marsudi, S., Saputra, T. D., & Lazaro, C. (2025). Comparative Study Of Ship Loading And Unloading Methods To Increase Productivity In Large Ports. Maritime Park: Journal Of Maritime Technology And Society, 23-29.

Mawardi, K., Santoso, W., Weda, I., & Yulianto, Y. (2024). Analisis Faktor Yang Memengaruhi Waktu Tunggu Kapal Di Pelabuhan Tanjung Intan Cilacap. Ocean Engineering: Jurnal Ilmu Teknik Dan Teknologi Maritim, 3(2), 92–108.

Negara, G. S., Weda, I., & Syabani, M. F. (2023). Analisis Pengaruh Faktor Penjadwalan Kapal, Jasa Pemanduan, Produktivitas Bongkar Muat Terhadap Waiting Time Kapal. Ocean Engineering: Jurnal Ilmu Teknik Dan Teknologi Maritim, 2(1), 76-87.

Ramadani, A., & Virandika, C. (2022). Analisa Pengaruh Waktu Tunggu Kapal Terhadap Biaya Logistik Di Terminal Peti Kemas Makassar. Riset Sains Dan Teknologi Kelautan, 168-174.

Scienceagri. (2024). 30 Indonesia’s Biggest Coal Mining Companies.

Sepfani, A. P., Akhmad, E. P. A., & Saputra, T. D. (2025). Waiting Time Analysis Of Passenger Vessels In Jamrud North Terminal Surabaya. Jurnal Aplikasi Pelayaran Dan Kepelabuhanan, 15(2), 235-246.

Storms, K., Sys, C., Vanelslander, T., & Van Deuren, R. (2023). Demurrage And Detention: From Operational Challenges Towards Solutions. Journal Of Shipping And Trade, 8(1), 3.

Ulkhaq, M. F., & Pratiwi, R. (2023). Analysis Of Indonesia's Position In The 2023 Logistics Performance Index (Lpi). Proceedings Of The International Conference On Research, Society, And Economy (Icrse), 6(1), 579-590.

United Nations Conference On Trade And Development. (2021). Review Of Maritime Transport 2021 (Chapter 4: Key Performance Indicators For Ports And The Shipping Fleet). Geneva: Unctad.

Wardana, I. M. A., & Dharmakarja, I. M. (2024). Analisis Efisiensi Proses Bongkar Muat Di Pelabuhan. Jurnal Logistik Indonesia, 12(1), 45-53.

Widyawati, N., & Yuliantini, B. E. (2019). Kesiapan Alat Bongkar Muat, Cuaca Dan Waktu Kedatangan Kapal Curah Kering Terhadap Waiting Time Berth Di Terminal Jamrud Cabang Tanjung Perak. Jurnal Baruna Horizon, 2(1), 36–45.


Full Text: PDF

DOI: 10.33751/jmp.v13i2.13082

Refbacks

  • There are currently no refbacks.